Skip to content

Water in a factory is both a production input and an environmental obligation. Both need a meter.

Factories & Industrial Facilities

Metering water per production line rather than per site, with emissions and noise monitoring and an auditable time series for regulators.

The problem

  • A single meter at the site inlet does not say which line is consuming more than it should.

  • A leak inside the plant network shows up only on the bill, a month after it started.

  • Emissions data is collected by hand at an inspection visit rather than continuously.

  • Rising utility cost is discussed without a breakdown, so any reduction decision is guesswork.

  • Environmental performance reporting needs a documented time series, not a snapshot taken on measurement day.

What it delivers

  • Consumption per production line

    A sub-meter on each line turns water into a per-unit cost that can be compared line against line.

  • Leak detection in hours

    Flow outside operating hours is an immediate alert, not a line on next month's bill.

  • A continuous environmental record

    Particulates, gases and noise sampled every minute, with reference calibration every six months.

Results

  • A sub-meter on each production line, so water becomes a cost per unit produced.
  • Flow outside operating hours is an immediate alert, not a line on next month's bill.
  • The raw reading is stored exactly as it arrived over MQTT, so any figure remains auditable years later.

Tell us about your land

Send the area, the crop and how you irrigate today. You get a written proposal with the numbers in it, not a sales call.